UMM
Results found: 71
UMM details
Active - Planned - TPP_MI2_G4
Message ID0000000000000000000000547_001, 0000000000000000000000547_002, 0000000000000000000000547_003, 0000000000000000000000547_004, 0000000000000000000000547_005
Event statusActive
Type of UnavailibilityPlanned
Type of EventProduction unavailability
Publication date/time2023/05/17 07:05
Event Start (ЕЕТ)2023/05/03 12:00
Event Stop (ЕЕТ)2023/05/17 07:15
Unit of MeasurementMW
Unavailable Capacity, MW99
Available Capacity, MW78
Installed Capacity in MW, MW177
Reason for the UnavailabillityBoiler - 7 disconnected from parallel for PPR. On 17.05.2023 from 00:00 in reserve. On 17.05.2023 at 07:00 Boiler-7 in parallel.
RemarksBoiler - 7 disconnected from parallel for PPR. On 17.05.2023 from 00:00 in reserve. On 17.05.2023 at 07:00 Boiler-7 in parallel.
Fuel TypeFossil Brown coal/Lignite
Bidding Zone10YCA-BULGARIA-R
Affected Asset or UnitTPP_MI2_G4
Unit EIC Code32W001100100044I
Market participantTPP MARITSA EAST 2 EAD
Market Participant ACER CodeA00033664.BG


© 2026 IBEX All rights reserved. Privacy Policy | Legal Terms | Site Map | Powered by E-act